Simultaneous Repairs on two Dredger Vessels

UK Docks dry dock the Britannia Aggregates dredging vessel ‘Britannia Beaver’ in No 2 dock and Hanson Aggregates vessel ‘Arco Dijk’, in No 3 dock. Both vessels docked for their 25 year special survey and during survey, routine maintenance was carried out on both vessels along with various steel renewals, dredge gear upgrades and paint coating renewals.